Technical Losses Optimization

The 2012 Program to reduce energy loss in the UNEG was developed within the framework of Federal Grid Company’s Energy Saving and Power Efficiency Program for the 2010-2014 period and included three key areas:

Annual volumes of electric energy loss, mln of KWh

Total area spanned – 75 Russian regions
square km
The length of our transmission lines is 131.6 thousand km.
This is equivalent to a spaceship orbiting the Earth four times.
A reliable energy sector
for Russia’s
economic growth
3 643 km
transmission lines
put into operation
in 2012
25 103
PEOPLE
Total number
of corporate
employees as of
31 December 2012
26%
over-fulfillment
of commissioning
plans for
substations